Evaluation of Successful and Failed Sections on National Highway (N-5) from Peshawar to Kamra with Emphasis on Geo technical Aspects [MS Thesis] / (Record no. 1930)

000 -LEADER
fixed length control field 00406 a2200085 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 624.15 ZAH
245 ## - TITLE STATEMENT
Title Evaluation of Successful and Failed Sections on National Highway (N-5) from Peshawar to Kamra with Emphasis on Geo technical Aspects [MS Thesis] /
Statement of responsibility, etc. Zahir Shah, Major
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Risalpur :
Name of publisher, distributor, etc. National Institute of Transportation,
Date of publication, distribution, etc. 2000
300 ## - PHYSICAL DESCRIPTION
Extent ix, 102p. :
Other physical details ill, col pics . ;
Dimensions 30 cm
Accompanying material CD
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Geotechnical Engineering
Holdings
Withdrawn status Lost status Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
        School of Civil and Environmental Engineering (SCEE) School of Civil and Environmental Engineering (SCEE)       624.15 ZAH NIT-04T 01/05/2017 01/05/2017 Book
        School of Civil and Environmental Engineering (SCEE) School of Civil and Environmental Engineering (SCEE)         NIT-0004T | NIT-0274 01/05/2017 01/05/2017 Book
        School of Civil and Environmental Engineering (SCEE) School of Civil and Environmental Engineering (SCEE)         NIT-274T 01/05/2017 01/05/2017 Book
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.