PROJECT SCHEDULE RISK MANAGEMENT THROUGH BUILDING INFORMATION MODELING (Record no. 524510)

000 -LEADER
fixed length control field 00585nam a22001817a 4500
003 - CONTROL NUMBER IDENTIFIER
control field NUST
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190621111722.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 190621b ||||| |||| 00| 0 eng d
038 ## - RECORD CONTENT LICENSOR
Staff Name Mr. Zahoor
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 624.01
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name M. Sami Ur Rehman
9 (RLIN) 15322
245 ## - TITLE STATEMENT
Title PROJECT SCHEDULE RISK MANAGEMENT THROUGH BUILDING INFORMATION MODELING
Statement of responsibility, etc. M. Sami Ur Rehman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Islamabd:
Name of publisher, distributor, etc. SCEE -NUST
Date of publication, distribution, etc. 2018.,
300 ## - PHYSICAL DESCRIPTION
Extent ill, 50 p.
Other physical details 29 cm.
Accompanying material CD.
500 ## - GENERAL NOTE
General note Hard Bound
600 ## - SUBJECT ADDED ENTRY--PERSONAL NAME
Source of heading or term Construction Engineering Management - MS- Thesis
Personal name M. Sami Ur Rehman
9 (RLIN) 15322
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
          Central Library (CL) Central Library (CL) Thesis 06/21/2019   624.01 CL-T-1753 06/21/2019 06/21/2019 Thesis
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.