Construction cost estimation and control (Record no. 554139)

000 -LEADER
fixed length control field 00448nam a22001457a 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CP-78
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Dr Hafiz Zahoor Ahmed khan
9 (RLIN) 51463
245 ## - TITLE STATEMENT
Title Construction cost estimation and control
Remainder of title Course Pack MS CE& M CEM-804
Statement of responsibility, etc. Dr Hafiz Zahoor Ahmed khan
250 ## - EDITION STATEMENT
Edition statement Fall semester 2017
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Risalpur,
Name of publisher, distributor, etc. MCE,
Date of publication, distribution, etc. 2017.
300 ## - PHYSICAL DESCRIPTION
Extent Different pages
500 ## - GENERAL NOTE
General note Construction Management
526 ## - STUDY PROGRAM INFORMATION NOTE
Program name 0
Interest level 0
Reading level 0
Title point value CP_78
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Book Bank
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
          Military College of Engineering (MCE) Military College of Engineering (MCE) 10/04/2018   CP-78 MCE-CP-78 10/04/2018 10/04/2018 Book Bank
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.