APU Design and Project Scheduling / (Record no. 607493)

000 -LEADER
fixed length control field 02531nam a22001697a 4500
003 - CONTROL NUMBER IDENTIFIER
control field NUST
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 670
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mahmood, Hamid
245 ## - TITLE STATEMENT
Title APU Design and Project Scheduling /
Statement of responsibility, etc. Hamid Mahmood
264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Islamabad
Name of producer, publisher, distributor, manufacturer SMME- NUST;
300 ## - PHYSICAL DESCRIPTION
Extent 139p. ;
Other physical details Soft Copy
Dimensions 30cm.
500 ## - GENERAL NOTE
General note In manufacturing industry, projects require large amount of money and human effort. But due to project complexity, many projects get delayed and cost overrun puts the progress of project at stake. It is at the core of project failure in terms of cost and time overruns. In defense industries, Auxiliary Power Unit (APU) has been designed to meet the requirements of the Power & Energy. NPS provides 10kW at 24VDC Power output. It ensures about system performance as identified and documented in adequate detail to support project objective. In a developing country like Pakistan; manufacturing of APU has never been practiced to its full potential to cope with power demand, which halts its implementation and continuous development. The overall objective of the researcher is to make process documents, Production plan for the manufacture of 10 KW Auxiliary power unit. This research attempts to develop a comprehensive Designing docs, Process planning and Production facility layout for manufacturing of non-rotary parts, scheduling and rout plans/sheets for the manufacturing of APU in Pakistan defense industry. A comprehensive and novel scheduling/planning on management tool of each manufacturing activity to shape this raw non- rotary material/item from raw form to finish product including processes planning and facility setup for their production on individual part basis and assemble them with Alternator Generator package finally to make a APU unit. Furthermore research is also carried out on supporting systems like Supply Chain Management, Logistics, Depreciation & Costing and Project Management & scheduling. After this research we will be able to make our own power units rather purchasing from other countries. It would help industry practitioners for achieving excellence in the implementation and continuous development of APU. Use of Project Management tool to visualize the manufacturing phases and activity relationship. Conclusions are drawn and practical implications are discussed.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element MS Design and Manufacturing Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Supervisor : Dr Liaqat Ali
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href=" http://10.250.8.41:8080/xmlui/handle/123456789/13228"> http://10.250.8.41:8080/xmlui/handle/123456789/13228</a>
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Thesis
Holdings
Withdrawn status Permanent Location Current Location Shelving location Date acquired Full call number Barcode Koha item type
  School of Mechanical & Manufacturing Engineering (SMME) School of Mechanical & Manufacturing Engineering (SMME) E-Books 01/23/2024 670 SMME-TH-105 Thesis
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.