FEASIBILITY STUDY FOR IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) ON PROPULSION SYSTEM OF F-22P SHIP / Taneer Anjum Bhatti.

By: Anjum, Taneer BhattiContributor(s): Shafiq ur RehmanMaterial type: TextTextPublisher: Islamabad : PNEC - NUST, 2011Description: x, Var. p. : ill. ; 30cmSubject(s): Industrial Mechanical Engineering MS-ThesisDDC classification: 670.5
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Shelving location Call number Status Date due Barcode Item holds
Thesis Thesis Central Library (CL)
Central Library (CL)
Thesis 670.5 (Browse shelf) Available CL-T-6097
Total holds: 0
Browsing Central Library (CL) shelves, Shelving location: Thesis Close shelf browser

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.