BIM Based claims management system : a centralized information repository for extension of time claims Babar Ali

By: Babar AliContributor(s): Project | Dr Rai Waqas Azfar KhanMaterial type: TextTextPublisher: Risalpur, MCE, 2018Description: 92pDDC classification: T-244
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Call number URL Status Date due Barcode Item holds
Book Book Military College of Engineering (MCE)
Military College of Engineering (MCE)
T-244 (Browse shelf) Link to resource Available MCE-T-244
Total holds: 0

0 0 0 T_244

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.