Formulation of a strategy based on the identified critical causes of schedule over run in mega construction

By: Aizaz Ahmad KhanMaterial type: TextTextPublisher: Risalpur, MCE, 2020Description: xiii,58pSubject(s): Construction Engineering and ManagementDDC classification: T-261
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Call number URL Status Date due Barcode Item holds
Book Book Military College of Engineering (MCE)
Military College of Engineering (MCE)
T-261 (Browse shelf) Link to resource Available MCE-T-261
Total holds: 0

0 0 0 T_261

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.