Causes of Time and Cost Over Run in the Construction Project of Pakistan

By: ShahbazContributor(s): Hamza Farooq GabrielMaterial type: TextTextPublisher: Risalpur Cantt MCE Description: P112DDC classification: P-320
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Call number URL Status Date due Barcode Item holds
Book Book Military College of Engineering (MCE)
Military College of Engineering (MCE)
P-320 (Browse shelf) Link to resource Available MCE-P-320
Total holds: 0

0 0 0 P_320

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.