000 01833 a2200193 4500
003 Nust
005 20230819133706.0
010 _a 79020864
020 _a0136802648
040 _cNust
082 0 0 _a658.5,PHI
100 1 _aPhillips, Cushing,
_944757
245 1 0 _aPlant engineer's desk handbook /
_cCushing Phillips, Jr.
260 _aEnglewood Cliffs, N.J. :
_bPrentice-Hall,
_cc1980.
300 _a234 p. :
_bill. ;
_c29 cm.
505 _aOrganizing and Staffing Plant Engineering for Effective Cost Control (Page-19), 14 Field Tested ways to Manage Plant Financial Resources (Page-39), Management Information for Painless Job and Budget Controls (Page-57), Plant Engineering Workload Generation an Important Management Tool (Page-79), Manpower Controls The Essence of Cost Controls (Page-91), Avoiding the Most Important Mistakes in Dealing with Unions (Page-95), Manpower Controls in Plant Operations How to Reduce Staff 50% OR More (Page-105) Profit-Gendered Preventive Maintenance Surefire Way to do Things Right (Page-115), Slash Service Work Cost with These Manpower and Job Controls (Page-1125), The Single Most Important Ingredient for Controlling Cost of any Plant Job (Page-137),The Four Most Neglected Steps in Effective Job Scheduling (Page-143), Implementing Flexible Workload Programming Systems (Page-155), The Great new way to Organize Custodial Work in the Plant (Page-161), Virtually Fail Proof Supply and Material Controls (Page-175), Pinpointing High Payoff Energy Conservation Areas in the Plant (Page-193) The Company Automobile Fleet Putting the Brakes on Running Dollars (Page-203), Management by Objective for the Plant Engineer (Page-215) Evaluating the Performance of the Plant Engineering Department (Page-221).
650 0 _aPlant engineering
_xHandbooks, manuals, etc.
_944758
942 _2ddc
_cBK
999 _c184937
_d184937