000 00566nam a22001577a 4500
999 _c524685
_d524685
003 NUST
038 _aMr. Zahoor
082 _a620.005
100 _aMuhammad Sami-uz-Zaman
_915482
245 _aINSPECTION AND ANALYSIS OF ELECTRIC HEATING ELEMENT PRODUCTION FACILITY AND VALIDATION OF A RECOMMENDED STRATEGY TO REDUCE REJECTIONS IN THE PRODUCTION LINE /
_cMuhammad Sami-uz-Zaman
260 _aIslamabad :
_bCEME - NUST,
_c2013.
300 _axi, 73 p. : ill. ;
_c30 cm.
500 _aHardcover.
600 _2Engineering Management - MS Thesis
942 _2ddc
_cTHE