000 01164cam a22003134a 4500
999 _c531976
_d531976
001 13641615
003 NUST
005 20191105120100.0
008 040630s2005 njua b 001 0 eng
010 _a 2004015326
020 _a0131148702
038 _aMSOHAIL
040 _aDLC
_cDLC
_dDLC
042 _apcc
050 0 0 _aTH438.4
_b.W43 2005
082 0 0 _a690.0685
_222
100 1 _aWeber, Sandra Christensen.
_925203
245 1 0 _aScheduling construction projects :
_bprinciples and practices /
_cSandra Christensen Weber.
260 _aUpper Saddle River, N.J. :
_bPearson Prentice Hall,
_cc2005.
300 _a333 p. :
_bill. ;
_c25 cm.
504 _aIncludes bibliographical references (p. 9) and index.
650 0 _aConstruction industry
_xManagement.
_9806
650 0 _aBuilding
_xSuperintendence.
_919468
650 0 _aProduction scheduling.
_919469
856 4 1 _3Table of contents
_uhttp://www.loc.gov/catdir/toc/ecip0419/2004015326.html
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
942 _2ddc
_cBK