000 00901cam a2200265 a 4500
999 _c532996
_d532996
003 Nust
005 20191210100342.0
008 170216b xxu||||| |||| 00| 0 eng d
020 _a0070097011 :
038 _aMSOHAIL
040 _cNust-
082 0 0 _a624.0685
_bCAL
100 1 _aCallahan, Michael T.
_926639
245 1 0 _aConstruction project scheduling /
_cMichael T. Callahan, Daniel G. Quackenbush, James E. Rowings.
260 _aNew York :
_bMcGraw-Hill,
_cc1992.
300 _axviii, 439 p. :
_bill. ;
_c24 cm.
650 0 _aConstruction industry
_xManagement.
_9806
650 0 _aNUST
_96342
650 0 _aProduction scheduling.
_919469
650 0 _aCritical path analysis.
_926640
700 1 _aQuackenbush, Daniel G.
_926641
856 4 2 _uhttp://www.loc.gov/catdir/description/mh022/91036133.html
856 4 1 _uhttp://www.loc.gov/catdir/toc/mh021/91036133.html
942 _cBK
_2ddc