000 00561nam a22001577a 4500
999 _c534760
_d534760
020 _qHard Cover.
082 _a629.04
100 _aKaleem, Sidra
245 _aEstimation of highway project duration at the planning stage and analysis of risk factors leading to time overrun /
_cSidra Kaleem.
260 _aIslamabad:
_bSCEE - NUST,
_c2014.
300 _a626 p. :
_bill. ;
_c30cm.
942 _2ddc
_cTHE
650 _aTransportation Engineering MS-Thesis.
_916276
700 _aDr. Muhammad Irfan
_917128