000 00557nam a22001577a 4500
999 _c535321
_d535321
020 _qHard Cover.
082 _a624.1
100 _aMashkoor, Aqsa
245 _aA bayesian analysis approach to quantify the cost overrun factors in road construction projects /
_cAqsa Mashkoor.
260 _aIslamabad:
_bNIT NUST,
_c2016.
300 _a58 p. :
_bill. ;
_c30cm.
942 _2ddc
_cTHE
650 _aConstruction Engineering and Management MS-Thesis.
_917023
700 _aDr. Jamaluddin Thaheem
_929437