000 00585cam a2200169 a 4500
020 _a0419218009
082 0 0 _a625.7
_bWOR
_cD
100 1 _aThe World Bank
_919583
245 1 0 _aStudy of the arterial highway network of Pakistan to the year 2015
_cThe World Bank
250 _aVol 1
260 _aLondon ;
_aNew York :
_bE&FN Spon,
_c1998.
300 _axvii, 257 p. :
_bill. ;
_c24 cm.
526 _a0
_b0
_c0
_d625_700000000000000_WOR
650 0 _aPrestressed concrete construction.
_920245
856 4 2 _uhttp://www.loc.gov/catdir/enhancements/fy0651/98166632-d.html
942 _2ddc
_cBK
999 _c547426
_d547426