000 01906cam a2200313 i 4500
001 19939995
005 20240829134526.0
008 170822s2019 nyu b 001 0 eng
010 _a 2017039940
020 _a9781292264905
040 _aDLC
_beng
_cDLC
_erda
_dDLC
042 _apcc
050 0 0 _aTA177.4
_b.S85 2019
082 0 0 _a658.15,SUL
_223
100 1 _aSullivan, William G.,
_d1942-
_eauthor.
245 1 0 _aEngineering economy /
_cWilliam G. Sullivan, Virginia Polytechnic Institute and State University, Elin M. Wicks, Abacus Accounting, LLC, C. Patrick Koelling, Virginia Polytechnic Institute and State University.
250 _aSeventeenth edition.
264 1 _aNY, NY :
_bPearson,
_c[2019]
300 _axxiv, 716 pages ;
_c24 cm
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
505 _aChapter 1: Introduction to Engineering Economy (Page-31), Chapter 2: Cost Concepts and Design Economics (Page-50),Chapter 3: Cost-Estimation Techniques (Page-92),Chapter 4: The Time Value of Money (Page-134), Chapter 5: Evaluating A Single Project (Page-218),Chapter 6: Comparison and Selection Among Alternatives (Page-276),Chapter 7: Depreciation and Income Taxes (Page-352), Chapter 8: Price Changes and Exchange Rates (Page-415),Chapter 9: Replacement Analysis (Page-452),Chapter 10: Evaluating Projects with the Benefit−Cost Ratio Method (Page-493),Chapter 11: Breakeven and Sensitivity Analysis (Page-525),Chapter 12: Probabilistic Risk Analysis (Page-553),Chapter 13: The Capital Budgeting Process (Page-597),Chapter 14: Decision Making Considering Multiattributes (Page-626).
650 0 _aEngineering economy.
700 1 _aWicks, Elin M.,
_eauthor.
_9125511
700 1 _aKoelling, C. Patrick,
_d1953-
_eauthor.
_9125512
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
942 _2ddc
_cBK
_k658.15,SUL
999 _c611248
_d611248