000 01906mam a22003494a 4500
001 3382098
003 NUST - PNEC
005 20170116181117.0
008 020618s2003 njua b 001 0 eng
010 _a 2002026369
015 _aGBA3-01887
020 _a0471413895 (cloth : alk. paper)
020 _a0471389374 (WIE)
035 _a(OCoLC)ocm50041632
040 _aDLC
_cLIBRARY
_dUKM
_dOrLoB-B
042 _apcc
050 0 0 _aTS177
_b.F324 2003
082 0 0 _a725.4 TOM
_221
100 _913279
_aTompkins, James A.
245 0 0 _aFacilities planning /
_cJames A. Tompkins
250 _a3rd ed.
260 _aHoboken, NJ :
_bJ. Wiley,
_cc2003.
300 _ax, 750 p. :
_bill. ;
_c26 cm.
504 _aIncludes bibliographical references and index.
505 0 0 _gPt. 1.
_tDefining Requirements --
_gCh. 1.
_tIntroduction --
_gCh. 2.
_tProduct, Process, and Schedule Design --
_gCh. 3.
_tFlow, Space, and Activity Relationships --
_gCh. 4.
_tPersonnel Requirements --
_gPt. 2.
_tDeveloping Alternatives: Concepts and Techniques --
_gCh. 5.
_tMaterial Handling --
_gCh. 6.
_tLayout Planning Models and Design Algorithms --
_gPt. 3.
_tFacility Design for Various Facilities Functions --
_gCh. 7.
_tWarehouse Operations --
_gCh. 8.
_tManufacturing Systems --
_gCh. 9.
_tFacilities Systems --
_gPt. 4.
_tDeveloping Alternatives: Quantitative Approaches --
_gCh. 10.
_tQuantitative Facilities Planning Models --
_gPt. 5.
_tEvaluating, Selecting, Preparing, Presenting, Implementing, and Maintaining --
_gCh. 11.
_tEvaluating and Selecting the Facilities Plan --
_gCh. 12.
_tPreparing, Presenting, Implementing, and Maintaining the Facilities Plan.
650 0 _aFactories
_xDesign and construction.
650 0 _aFacility management.
_xMIS
700 1 _aTompkins, James A.
856 4 1 _3Table of contents
_uhttp://www.loc.gov/catdir/toc/wiley023/2002026369.html
900 _bTOC
942 _2ddc
_cBK
999 _c69389
_d69389