Evaluation of project time and cost management in the construction industry of pakistan (Record no. 551207)

000 -LEADER
fixed length control field 00464nam a22001457a 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number T-175
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Sayyed Awais Ullah
9 (RLIN) 48193
245 ## - TITLE STATEMENT
Title Evaluation of project time and cost management in the construction industry of pakistan
Statement of responsibility, etc. Sayyed Awais Ullah
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Risalpur
Name of publisher, distributor, etc. Sayyed Awais Ullah
Date of publication, distribution, etc. c2014
300 ## - PHYSICAL DESCRIPTION
Extent 49 p.:
526 ## - STUDY PROGRAM INFORMATION NOTE
Program name 0
Interest level 0
Reading level 0
Title point value T_175CEM_SAYYED_AWAIS_ULLAH
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element MCE
9 (RLIN) 379
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Dr. Sarfraz Ahmed
9 (RLIN) 29043
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type Public note
          Military College of Engineering (MCE) Military College of Engineering (MCE) 12/04/2014   T-175CEM Sayyed Awais Ullah MCE-T-175 12/04/2014 03/14/2021 Book Project.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.