Evaluation of project time and cost management in the construction industry of pakistan Sayyed Awais Ullah

By: Sayyed Awais UllahContributor(s): Dr. Sarfraz AhmedMaterial type: TextTextPublisher: Risalpur Sayyed Awais Ullah c2014Description: 49 pSubject(s): MCEDDC classification: T-175
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Home library Call number URL Status Notes Date due Barcode Item holds
Book Book Military College of Engineering (MCE)
Military College of Engineering (MCE)
T-175CEM Sayyed Awais Ullah (Browse shelf) Link to resource Available Project. MCE-T-175
Total holds: 0

0 0 0 T_175CEM_SAYYED_AWAIS_ULLAH

There are no comments on this title.

to post a comment.
© 2023 Central Library, National University of Sciences and Technology. All Rights Reserved.